Pool Restoration Project
Click Thumbnail for Full Size Image
The Pool, Almost Empty | Yuck, Look at that Algae | Benjamin with Algae | Pool Empty, No concrete removed | Close-Up of Bottom of Pool with Drain Pump |
Coping and Tile Being Removed | Coping and Tile Being Removed | Benjamin helping to remove the Old Deck | All the Old Concrete is Jack-Hammered Out, Early on a Saturday Morning--The Neighbors are not Pleased. | Old Concrete Is Hauled Away--By Hand |
New Coping with Plumbing Alongside | Return Line Over by Steps | Pipes to Pool Equipment Area | Pipes Along Pool | Reserved |
Northwest Corner, Around Tree | Benjamin in front of Concrete Mixer Truck | Steps by Sliding Doors | Looking Across Pool | Island for Drainage and Statue |
Stamping | Stamping | Concrete | Smoothing Concrete with Skids on Legs | Don, owner of Ace Construction, Sprinkling Sub-Highlight Colors |
New Stamped Concrete | New Stamped Concrete | New Stamped Concrete | Left Side of House, Broom Finish, Equipment not Yet Re-Installed | Primer is Applied to Inside of Pool |
Drain Hole at Curb | Drains in Concrete | Pool Equipment Reconnected, Steve had to do the electrical | Mastic Between Concrete and Coping | Reserved |
Adams Trucks |
Preparation for Pebbletec Application | Preparation for Pebbletec Application | Pebbletec Being Applied | Pebbletec Being Applied |
Pebbletec Being Applied | Pebbletec Being Applied | Pebbletec Being Applied | Pebbletec Being Applied | Reserved |